Vancouver, B.C., February 03, 2026 - Spanish Mountain Gold Ltd. (the "Company" or "Spanish Mountain Gold") (TSX-V: SPA) (FSE: S3Y) (OTCQB: SPAUF) is pleased to report additional assay results from four exploration drill holes within the Orca Fault target trend that were completed as part of its 2025 Fall Diamond Drill program (“2025 Fall Drill Program”) for the Spanish Mountain Gold (“SMG”) project, which is located in the Cariboo Gold Corridor, British Columbia, Canada. 

The company has completed approximately 10,870 metres (“m”), surpassing the original estimate of drilling of 9,000 to 10,000 m of exploration drilling planned under the 2025 Fall Drill Program, now continuing into 2026. Assays and geochemistry are pending receipt from the laboratory and or reporting from four additional drill holes completed within the Orca Fault target area.

Highlights:

  • 25-DH-1324 intersected broad gold mineralization from 69.00 m totaling 108.80 m grading 0.68 g/t gold that include two key intervals:
    • 27.75 m of 0.82 g/t gold from 69.00 m including 18.01 m of 1.10 g/t gold; and
    • 57.80 m of 0.82 g/t gold from 120.00 m including 3.08 m of 1.42 g/t gold and 2.42 m of 4.10 g/t gold.
  • 25-DH-1325 intersected two intervals of gold mineralization including:
    • 103.35 m of 0.88 g/t gold from 15.65 m including 56.40 m of 1.35 g/t gold with a high-grade subset of 9.90 m of 3.54 g/t gold; and
    • 15.15 m of 0.65 g/t gold from 255.00 m including 1.85 m of 3.28 g/t gold.
  • 25-DH-1326 intersected three intervals of gold mineralization including:
    • 116.50 m of 0.44 g/t gold from 20.00 m including 83.50 m of 0.51 g/t gold with a high-grade subset of 36.70 m of 0.79 g/t gold;
    • 10.00 m of 0.64 g/t gold from 191.00 m including 4.00 m of 1.28 g/t gold; and
    • 34.50 m of 0.82 g/t gold from 288.50 m including 18.00 m of 1.31 g/t gold with a high-grade subset of 3.50 m of 3.21 g/t gold.

Key Findings:

  • Current exploration drilling assay results continues to intersect significant higher-grade mineralization over 530 m in strike length in the Orca Fault target area (Figure 4) and the continuity can now be traced across multiple parallel, adjacent drill sections over 80 to 190 m.

Main Deposit – Orca Fault area

Four additional drill holes were collared and successfully completed (see Figure 4) in the Orca Fault target area, 25-DH-1324 (Figure 1 and Table 1), 25-DH-1325 (Figure 3 and Table 2), 25-DH-1326 (Figure 2 and Table 3), and 25-DH-1327 (Figure 1, Figure 3, and Table 4). These drill holes continue to confirm and lend confidence to the extent of the Orca Fault target area over 530 m strike length, northwest to southeast, and its geological and structural interpretation within the constraining open pit for the MRE (see July 3, 2025 news release). 

The continued intersection of wide zones of higher-grade gold mineralization, such as in drill hole 25-DH-1325 (Figure 3 and Table 2) reinforces the opportunities for not only enhancing the Orca Fault target understanding but developing favorable structures outward into other areas of the Main deposit while exploring for higher-grade gold mineralization in the near surface, open pit environment, as defined in the recent MRE (see July 3, 2025 news release). Drill hole 25-DH-1325 intersected 0.88 g/t gold over 103.35 m to a downhole depth of 119.00 m that included three significant subintervals (see Table 2).

The analytical results from the lower portion of drill hole 25-DH-1324 (see Figure 1 and Table 1) were released and significantly lengthen the previously published main composite (see January 16, 2026 news release) to 108.80 m of 0.68 g/t gold. As well, both drillhole 25-DH-1326 (see Figure 2 and Table 3) and 25-DH-1327 (Figure 1, Figure 3 and Table 4) further reinforce the presence of significant, deeper, high-grade mineralization like 25-DH-1321 (see January 26, 2026 news release).  These deeper analytical results for gold also correlate to the deeper gold mineralization in drill hole 25-DH-1316 and 25-DH-1318 (see January 6, 2026 news release), adding more information about the prospectivity of the mineral potential of the lithological units at depth.

All results to date continue to reinforce that tighter exploration drill spacing is unlocking additional mineral potential in the Main deposit. These exploration drill holes are presented on drill sections (Figure 1, Figure 2, and Figure 3) that shows the alignment of the higher-grade mineralization to the new Orca Fault target. The location of these drill holes is shown on a plan map at the end of the news release (Figure 4).

Table 1: Assay Results for 25-DH-1324

Drill hole From
(m)
To (m) Width
(m)
Gold
(g/t)
Apparent True
Thickness

25-DH-1324

16.00 17.15 1.15 13.47 Note 3) and 4)
  50.45 58.30 7.85 0.53 Note 3) and 4)
Including 50.45 51.80 1.35 1.17 Note 3)
  69.00 177.80 108.80 0.68 Note 3) and 5)
Including 71.18 89.19 18.01 1.10 Note 3) and 4)
Including 78.00 89.19 11.19 1.16 Note 3) and 4)
Including 69.91 97.66 27.75 0.82 Note 3)
Including 120.00 177.80 57.80 0.82 Note 3) and 5)
Including 122.00 125.08 3.08 1.42 Note 3) and 4)
  131.00 133.42 2.42 4.10 Note 3)
  240.00 240.50 0.50 1.57 Note 3)

Table 2: Assay Results for 25-DH-1325

Drill hole From
(m)
To (m) Width
(m)
Gold
(g/t)
Apparent True
Thickness

25-DH-1325

15.65 119.00 103.35 0.88 Note 3)
Including 44.00 100.40 56.40 1.35 Note 3)
Including 90.50 100.40 9.90 3.54 Note 3)
  147.48 148.70 1.22 1.12 Note 3)
  255.00 270.15 15.15 0.65 Note 3)
Including 268.30 270.15 1.85 3.28 Note 3)
  288.80 290.50 1.70 1.86 Note 3)

Table 3: Assay Results for 25-DH-1326

Drill hole From
(m)
To (m) Width
(m)
Gold
(g/t)
Apparent True
Thickness
25-DH-1326 20.00 136.50 116.50 0.44 Note 3)
Including 20.00 103.50 83.50 0.51 Note 3)
Including 64.00 100.70 36.70 0.79 Note 3)
Including 64.00 80.00 16.00 1.32 Note 3)
  155.55 165.00 9.45 0.48 Note 3)
  191.00 201.00 10.00 0.64 Note 3)
Including 192.50 196.50 4.00 1.28 Note 3)
  288.50 323.00 34.50 0.82 Note 3)
Including 303.50 321.50 18.00 1.31 Note 3)
Including 318.00 321.50 3.50 3.21 Note 3)

Table 4: Assay Results for 25-DH-1327

Drill hole From
(m)
To (m) Width
(m)
Gold
(g/t)
Apparent True
Thickness
25-DH-1327 17.85 22.85 5.00 0.75 Note 3)
  39.50 98.00 58.50 0.49 Note 3)
Including 39.50 79.00 39.50 0.59 Note 3)
Including 50.70 75.00 24.30 0.75 Note 3)
Including 56.54 66.53 9.99 1.21 Note 3)
  132.50 194.00 61.50 0.47 Note 3)
Including 140.20 172.50 31.30 0.77 Note 3)
Including 162.00 172.50 10.50 1.86 Note 3)
  212.00 248.00 36.00 0.55 Note 3)
Including 231.00 236.00 5.00 2.87 Note 3)
  263.00 264.00 1.00 1.43 Note 3)
  308.10 314.00 5.90 1.22 Note 3)

Notes for Table 1 to Table 4:

  1. Reported intersections are calculated using a 0.15 g/t Au cut-off grade.
  2. The complete assay table is available on the Company’s website
  3. True thickness of mineralization is unknown as the project is still at the exploration stage
  4. Assay composites previously released January 26, 2026 from partial return of drill hole 25-DH-1324 from laboratory
  5. Re-calculated composite for interval partially released January 26, 2026

The integration of assay results from these four exploration drill holes strengthens the overall continuity for the new Orca Fault target and the association of higher-grade mineralization over a strike length of 530 m, northwest to southeast (see Figure 4). Stronger continuity is also now being developed spanning multiple, parallel, adjacent drill sections ranging in strike length from 80 to 190 m, northeast to southwest, depending on the location along the 530 m strike length (see Figure 2).

Figure 4 illustrates the locations for four drill hole results outlined in this news release and the drill holes currently in the assay lab, or in process of being drilled. Drill collar location coordinates are summarized for the 2025 Fall Drill Program in Table 5 at the end of this news release.

Qualified Person
Julian Manco, M.Sc., P.Geo., Director of Exploration with Spanish Mountain Gold, is the Qualified Person as defined under National Instrument 43-101 who has reviewed the technical information in this news release and has approved the content for dissemination.

Abbreviations: metres = m, grams per tonne = g/t, gold = Au, mineral resource estimate = MRE, Spanish Mountain Gold = SMG

Figure 1: Drill Long Section Through Orca Fault Area (looking northeast); section line A-A’ (see Figure 4)

Figure 2: Drill Cross Section Through Orca Fault Area (looking northwest); section line B-B’ (see Figure 4)

Figure 3: Drill Cross Section Through Orca Fault Area (looking northwest); section line C-C’ (see Figure 4)

Drill Core Processing, Data Verification and Quality Assurance – Quality Control Program (QAQC)

Once received from the drill and processed, all drill core samples were sawn in half, labeled, and bagged. The remaining half of the drill core was securely stored on-site. Numbered security tags were applied to sample shipments to ensure chain of custody compliance. The Company inserts quality control (QC) samples at regular intervals, including blanks and reference materials, for all sample shipments to monitor laboratory performance.

Standards and blanks account for a minimum of 20% of the samples in addition to the laboratory’s internal quality assurance programs. The QAQC program was overseen by the Company’s Qualified Person, Julian Manco, P.Geo, Director of Exploration (as described below).

The data verification process involved a multi-step approach to ensure accuracy and integrity. This included a detailed quality control (QC) analysis of the data, which was performed using both internal and external platforms, such as the MxDeposit™ software. These QC checks involved the analysis of certified reference materials (CRMs), blanks, and duplicates to confirm the reliability of the assay results. In addition, a field inspection of the specific drill intervals mentioned in this release has been conducted to directly observe the geological features and verified the nature of the results presented.

Drill core samples were submitted to MSALABS’s analytical facility in Prince George, British Columbia, for sample preparation and PhotonAssayTM analysis. The MSALABS facilities are accredited to the International Standards ISO/IEC 17025 and ISO 9001 standard for gold and multi-element assays, with all analytical methods incorporating quality control materials at defined frequencies and established data acceptance criteria. MSALABS Inc. is independent of the Company.

PhotonAssayTM 
The PhotonAssayTM method utilizes gamma ray analysis for gold detection using the Chrysos PhotonAssayTM instrument (PA1408X). This non-destructive, fully automated technique offers high accuracy for analyzing ores and pulps. Sample preparation begins with drying and crushing up to 1 kg of material to achieve at least 70% passing through a 2-millimetre (mm) sieve. The sample is then riffle split to obtain a suitable aliquot for 2 testing cycles (MSALABS Method CPA-Au1).

The PhotonAssayTM instrument bombards 400- to 600-gram samples contained in sealed containers with gamma rays. These containers remain sealed throughout the process, preserving the sample for potential further testing. The analysis is performed robotically, with results that integrate into existing laboratory management systems. Each sample is accompanied by a reference disc traceable to a Certified Reference Material (CRM). Both the sample and reference disc undergo gamma ray exposure, with signals detected and analyzed to ensure accurate and reliable results. The method offers a gold detection range from 0.015 parts per million (ppm - lower limit) to 10,000 ppm (upper limit). Quality control includes the use of reference materials and blanks, with all results reviewed by a competent person before reporting.

Spanish Mountain Gold implemented two QAQC methodologies to validate the accuracy of PhotonAssayTM results, both demonstrating good comparability: 1) comparative analysis of diverse mineralization styles using Total Au screen metallic methods with both FAS-415 (gravimetric finish) and FAS-211 (AAS finish), and 2) comprehensive testing of both sample aliquots and rejects using FAS-211 (AAS finish). QAQC Testing typically can include the following spot checks: 1) Pulverizing tests to evaluate variability in sample preparation, 2) Cross-analysis at external laboratories using screen metallic method, and 3) Four-cycle radiation testing to identify and calibrate potential variability in gold results with variable radiation intensity.

Multi-Elemental Analysis
For the 2025 drilling campaign Spanish Mountain Gold used IMS-230 method to provide multi-element determination using a four-acid digestion followed by ICP-OES and ICP-MS analysis.

Key Process Steps:
Sample Preparation: Samples are dried and ground to a specific criterion (85% passing 75 microns (μm) for rocks and drill core; 180μm for soils and sediments). A homogeneous 10-gram sample is required. Digestion: Samples undergo sequential digestion with nitric, perchloric, hydrofluoric, and hydrochloric acids, followed by dilution with deionized water.

Analysis: The solution is analyzed via ICP-OES and ICP-MS for multi-element quantification.

Quality Control: The process includes reference materials, blanks, and duplicates, with corrections for spectral interferences and thorough review before final reporting.

About Spanish Mountain Gold Ltd.
Spanish Mountain Gold Ltd. is focused on advancing its 100%-owned Spanish Mountain Gold Project (Project) towards its goal to build the next gold mine in the Cariboo Gold Corridor, British Columbia. On August 18, 2025, the Company filed an NI 43-101 Technical Report on SEDAR+ that sets out the Project’s de-risked and optimized Preliminary Economic Assessment (PEA), with an updated Mineral Resource Estimate (MRE). We will continue to advance the Project to position the Company to make a construction decision in 2027. We are striving to be a leader in community and Indigenous relations by leveraging technology and innovation to build the 'greenest' gold mine in Canada. The Relentless Pursuit for Better Gold means seeking new ways to achieve optimal financial outcomes that are safer, minimize environmental impact and create meaningful sustainability for communities. Details on the Company are available on www.sedarplus.ca and on the Company's website: www.spanishmountaingold.com.

On Behalf of the Board,

“Peter Mah”
President, Chief Executive Officer and Director 
Spanish Mountain Gold Ltd.

For more information, contact:
Peter Mah
(604) 601-3651
info@spanishmountaingold.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

FORWARD-LOOKING INFORMATION:
Certain of the statements and information in this press release constitute "forward-looking information". Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "believes", "plans", "estimates", "intends", "targets", "goals", "forecasts", "objectives", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be considered  forward-looking information. The Company's forward-looking information is based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release and include but are not limited to statements with respect to, the potential for adding more higher-grade gold mineralization within the pit or outside the current pit design; and the receipt of further results from additional drilling under the 2025 Fall Drill Program, and the plan to make a construction decision in 2027. Other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking information if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking information.

Table 5: Drill Collar Information for Drill Holes

Hole ID EAST NORTH ELEV AZIMUTH DIP DEPTH COMMENT
25-DH-1334 604254 5827971 1116 120 -60 N/A In Progress
25-DH-1333 604236 5828012 1104 120 -60 N/A In Progress
25-DH-1332 604185 5828088 1091 120 -65 372 Successfully completed per design
25-DH-1331A 604595 5827901 1103 120 -60 240 Successfully completed per design
25-DH-1331 604594 5827899 1103 120 -60 55 Ended early due stuck drill rods
25-DH-1330 604332 5827990 1105 120 -60 351 Successfully completed per design
25-DH-1329 604467 5827962 1090 120 -60 255 Successfully completed per design
25-DH-1328 604278 5828018 1105 120 -58 402 Successfully completed per design
25-DH-1327 604411 5828026 1088 120 -60 327 Successfully completed per design
25-DH-1326 604327 5827963 1108 120 -60 351 Successfully completed per design
25-DH-1325 604385 5827966 1103 120 -60 309 Successfully completed per design
25-DH-1324 604343 5828053 1080 120 -60 276 Successfully completed per design
25-DH-1323 604286 5828046 1097 120 -60 338 Successfully completed per design
25-DH-1322 604279 5827995 1106 120 -60 231 Successfully completed per design
25-DH-1321 604350 5828016 1099 120 -60 348 Successfully completed per design
25-DH-1320 604561 5827809 1126 120 -60 57 Ended early due to major fault zone
25-DH-1319 604404 5827992 1095 120 -70 198 Successfully completed per design
25-DH-1318 604445 5828098 1055 120 -60 243 Successfully completed per design
25-DH-1317 604186 5828166 1076 120 -60 282 Successfully completed per design
25-DH-1316 604514 5828073 1050 120 -60 177 Successfully completed per design
25-DH-1315 604231 5828163 1075 120 -60 282 Successfully completed per design
25-DH-1314 604160 5828218 1056 120 -70 270 Successfully completed per design
25-DH-1313 604566 5827908 1100 120 -60 204 Successfully completed per design
25-DH-1312 604538 5827921 1095 120 -60 205 Successfully completed per design
25-DH-1311 604590 5827935 1084 120 -60 330 Successfully completed per design
25-DH-1310 604592 5827961 1091 120 -60 211 Successfully completed per design
25-DH-1309 604592 5827958 1071 120 -60 237 Successfully completed per design
25-DH-1308 603280 5829250 966 120 -60 150 Successfully completed per design
25-DH-1307 604565 5827974 1068 120 -60 200 Successfully completed per design
25-DH-1306 603451 5829400 927 120 -60 123 Successfully completed per design
25-DH-1305 603657 5829226 919 120 -60 126 Successfully completed per design
25-DH-1304 604536 5827986 1067 120 -60 225 Successfully completed per design
25-DH-1303 603960 5828754 943 100 -55 156 Successfully completed per design
25-DH-1302 604194 5828180 1066 120 -63 282 Successfully completed per design
25-DH-1301 603708 5829029 929 150 -55 188 Successfully completed per design
25-DH-1300 604388 5828063 1085 120 -60 274 Successfully completed per design
25-DH-1299 604369 5828043 1093 120 -60 336 Successfully completed per design
25-DH-1298 604402 5828088 1074 120 -59 334 Successfully completed per design
25-DH-1297 604354 5828069 1084 120 -59 342 Successfully completed per design
25-DH-1296 604484 5828054 1061 120 -50 180 Successfully completed per design
25-DH-1295 604484 5828054 1061 120 -60 33 Ended early due to drill trace spacing
25-DH-1294 604345 5828120 1075 120 -58 351 Successfully completed per design
25-DH-1293 604284 5828149 1076 120 -60 453 Successfully completed per design
25-DH-1292 604223 5828189 1068 120 -62 270 Successfully completed per design

Figure 4: Drill Collar Location Map for 2025 Fall Drill Program

© 2026 Spanish Mountain Gold Ltd.